1 | Regional Rural Water Supply Schemes (R.R.W.S.S) for Chiwali and 3 villages Tal: Kannad Dist: Aurangabad. | Maharashtra Jeevan Pradhikaran (MJP) | MJP | 50.00 | Completed in 1997. | |
2 | Individual Water Supply Scheme for Bharamba Tanda Tal: Kannad Dist: Aurangabad. | MJP | MJP | 10.00 | Completed in 1997 | |
3 | Seven R.R.W.S.S for various talukas of Aurangabad District. | MJP | Elite Consultants Pune | 1000.00 | Completed in 1998 | |
4 | Seven R.R.W.S.S for various talukas of Aurangabad District. | MJP | Network Associates Nagpur | 2000.00 | Completed in 1999. | |
5 | Beed Sewerage Project – site investigations and survey. | MJP | Ray Consultants | 1500.00 | Completed in 1999. | |
6 | Hydraulic Modeling of Distribution System for Ahmednagar Municipal Corporation. | Ahmednagar Municipal Corporation | Ecosystems | NA | Completed in 2010. | Sh Vijay Gawade (Director Ecosystems) - 09730255747 |
7 | Refurbishment of Water treatment Plant for Khuldabad Municipal Council. | Khuldabad Municipal Council. | Khuldabad Municipal Council. | 15.00 | Completed in 2010. | Sh Bali (Municipal Engg) - 09421674097 |
8 | Water Supply Design works for various contractors working Under Pune Municipal Corporation (PMC). | Contractors | Pune Municipal Corporation | 2100.00 | Completed in 2010. | Sh Haribakht (EE PMC) - 9689931954 |
10 | Design of Common Pipeline for Runwal, Sobha and H&M Royal Builders. | Builders | Builders | 65.00 | Completed in 2010. | |
12 | Detailed Project Report of Distribution System for Jamner Municipal Council. | Jamner Municipal Council | Jamner Municipal Council. | 350.00 | Completed in 2012 | Sh Dighe (Chief Officer) – 09850916494 |
13 | Preparation of DPR for Augmentation of Panvel Water Supply Scheme (Stage -IV)- Phase -I under AMRUT scheme. | Panvel Municipal Council | Panvel Municipal Council. | 2435.00 | Completed in 2016 | Sh Alghat (Municipal Engg) - 08805023113 |
14 | Preparation of DPR for development of Green spaces in Barshi council area under AMRUT scheme | Barshi Municipal Council | Barshi Municipal Council. | 112.00 | Completed in 2017 | Sh Honkhambe (Municipal Engg) - 08805023113 |
15 | Preparation of DPR for development of Green spaces in Panvel council area under AMRUT scheme | Panvel Municipal Council | Panvel Municipal Council. | 100.00 | Completed in 2016 | Sh Alghat (Municipal Engg) - 08805023113 |
16 | Detailed Design, Preparation of drawing and Estimation of Quantity for the water supply network of Ulwe SEZ area of Navi Mumbai SEZ area. | Urban Energy Generation Pvt Ltd | Urban Energy Generation Pvt Ltd | 30.00 | Completed in 2016 | Sh Manoj Patwardhan (GM UWSPL) - 9867557355 |
17 | Preparation of DPR on Reuse of Grey water in Panvel Municipal Council area. | Panvel Municipal Council | Panvel Municipal Council. | 405.41 | Completed in 2016 | Sh Alghat (Municipal Engg) - 08805023113 |
18 | Preparation of Underground Sewerage DPR for Barshi Municipal Council under Atal Mission For Rejuvenation & Urban Transformation (AMRUT) scheme | Barshi Municipal Council | Barshi Municipal Council. | 15320.00 | Completed in 2015 | Sh Honkhambe (Municipal Engg) - 08805023113 |
19 | Preparation of DPR of underground sewerage scheme for 4 nos. of slum pockets of Pandharpur Municipal Council area | Pandharpur Municipal Council | Pandharpur Municipal Council | 186.00 | Completed in 2015 | Sh. Jadhav (Municipal Engg) - 07774070124 |
20 | DPR of Integrated Water Bodies Rejuvenation and Development of Lakes/Water Bodies in Tiroda Municipal Council | Tiroda Municipal Council | Tiroda Municipal Council | 800.79 | Completed in 2015 | |
21 | Design of Main water supply lines along the Concrete roads in Panvel Municipal Council | Panvel Municipal Council | Panvel Municipal Council. | 165.00 | Completed in 2015 | Sh Alghat (Municipal Engg) - 08805023113 |
22 | Preparation of DPR on designing and estimation of transmission line from Gothivali ESR to MIDC tapping Including railway crossing at Rabada | NMMC | NMMC | 255.00 | Completed in 2014 | |
23 | Preparation of DPR on designing and estimation of distribution network in Sec-22 and 23 GES in Ghansoli Node of NMMC | NMMC | NMMC | 302.00 | Completed in 2014 | |
24 | Preparation of DPR on design of RCC ESR (0.5 Ml) & GSR (1 Ml) Capacity for Mahape area of Koparkhairne Ward | NMMC | NMMC | 242.00 | Completed in 2014 | |
25 | Preparation of DPR for underground drainage scheme for Dehu Gaothan. | Neogen Consultants | Neogen Consultants. | 2013.31 | Completed in 2013 | |
26 | Preparation of DPR of Lake Conservation for Khuldabad Municipal Council. | Khuldabad Municipal Council. | Khuldabad Municipal Council. | 264.45 | Completed in 2013 | Sh Bali (Municipal Engg) - 09421674097 |
27 | Preparation of Detailed Project Report for Underground Sewerage System for Aurangabad Municipal Corporation. | Aurangabad Municipal Corporation | Fortress Infrastructure Advisory Services. | 37000.00 | Completed in 2013 | |
28 | Preparation of DPR for Augmentation of Water Supply Scheme Phase-2 at Gangapur under UIDSSMT | Gangapur Municipal Council | Gangapur Municipal Council | 1844.00 | DPR Completed in 2013 | |
29 | Validation of Water Distribution System for Ulwe SEZ Navi Mumbai. | Urban Water Supply Pvt Ltd | Urban Water Supply Pvt Ltd | NA | Completed in 2013 | Sh Manoj Patwardhan (GM UWSPL) - 9867557355 |
30 | Detailed Project Report for Domestic Meters for Ahmednagar Municipal Corporation. | Ahmednagar Municipal Corporation. | Ahmednagar Municipal Corporation. | 5400.00 | Completed in 2013 | |
31 | Design & Supervision of Internal Concrete Roads in Panvel Municipal Council Area. | Panvel Municipal Council | Panvel Municipal Council | 2600.00 | Completed in 2013 | Sh. Sanjay Katekar (City Engg. 9920064301) |
32 | Hydraulic design & supervision for Rising Main of 457mm dia MS at Holkar WTP to Khadki ESR | Pune Municipal Corporation. | Pune Municipal Corporation. | 131.00 | Completed in 2013 | |
33 | Preparation of Project Report on Rehabilitation/ Reconstruction of Existing Sewerage System for Jamshedpur. | JUSCO | Tata Consulting Engineers (TCE) | NA | Completed in 2012 | |
34 | Feasibility Report of Water Supply to Power Plants for Urban Energy Generation Pvt Ltd | Urban Energy Generation Pvt Ltd | Urban Energy Generation Pvt Ltd | 41300.00 | Completed in 2011. | Sh Manoj Patwardhan (GM UWSPL) - 9867557355 |
35 | Carrying Out Consumer Survey, Water Audit, Energy Audit, Supply and Installation of Flow Meters, Hydraulic Modeling and GIS Mapping For Gangapur Water Supply Scheme | Gangapur Municipal Council. | Gangapur Municipal Council. | 35.00 | Completed | |
36 | Feasibility study of proposed water supply line from AMC STP Plant (Near Salim Ali Lake) to Golf Course Site( Opp. Harsul Dam) Aurangabad | Inspira Leisure and Hospitality Ltd. | Inspira Leisure and Hospitality Ltd. | 100.00 | Completed | |
37 | Hydraulic design & supervision consultant for the contraction of Ground water tank at Taljai Pathar for PMC | Pune Municipal Corporation. | Pune Municipal Corporation. | 200.00 | Completed | |
38 | Hydraulic design & supervision for Pumping Main of 750mm dia MS from Wadgaon WTP to Institute ESR | Pune Municipal Corporation. | Pune Municipal Corporation. | 220.00 | Completed | |
39 | Preparation of DPR for Underground Sewerage System for Uran Municipal Council. | Uran Municipal Council | Uran Municipal Council | 3900.00 | Completed in 2015 | Sh. Mane, City Engg. (8655535907) |
40 | Providing Consultancy Services for Structural Audit of Sewage Pump houses in Belapur Ward of NMMC | Navi Mumbai Municipal Corporation | Navi Mumbai Municipal Corporation | Ongoing | Mr. Santosh Choudhari 9987181319 | |
41 | Consultancy Services for Preparing design, drawings, technical Parameters and detailed estimates for the work of Construction of Sewage Pumping stations of Capacity. 3.5MLD( PS-l) and 9 .77M LD (P S-ll)in Nagar-l, at Waluj Mahanag | CIDCO | CIDCO | 900.00 | Ongoing | Sh. Autade, DE. (9422322868) |
42 | Preparation of DPR for Sewerage Treatment Plant and Underground Drainage Scheme Of Pandharpur Municipal Council Area. | Pandharpur Municipal Council | Pandharpur Municipal Council | 6500.60 | DPR Submitted for Approval | Sh. Jadhav (Municipal Engg) - 07774070124 |
43 | Preparation of DPR for Augmentation of Existing Water Supply Scheme (Stage-IV - Phase II) for Panvel City under AMRUT Scheme. | Panvel Municipal Council | Panvel Municipal Council | 7800.78 | DPR Submitted for Approval | Sh Alghat (Municipal Engg) - 08805023113 |
44 | Preparation of DPR for Augmentation of Existing Water Supply Scheme (StageIV) Phase-II of Panvel Water Supply Scheme for Panvel City under Maharashtra Suvarna Jayanti Nagarotthan Maha Abhiyan Scheme | Panvel Municipal Council | Panvel Municipal Council | 200.00 | Ongoing | Sh Alghat (Municipal Engg) - 08805023113 |
45 | Preparation of DPR for Reuse of Treated Waste Water for Garden & Public Utility (Non-Potable) Use in Panvel Municipal Council Area | Panvel Municipal Council | Panvel Municipal Council | 800.00 | Ongoing | Sh Alghat (Municipal Engg) – 08805023113 |
Sr.No | Name of Work | Name of client | Name of Agency | Project Value (Rs lacs) |
Remarks | Reference (contact name & number) |
---|---|---|---|---|---|---|
1 | Project Management Consultancy for Leachate Treatment Plant at Solid waste Landfill site at Turbhe Navi Mumbai. | NMMC | Space Kreators Developers Pvt Ltd. | 387.00 | Completed | |
2 | Project Management Consultancy for Development of Garden at Khuldabad. | Khuldabad Municipal Council | Khuldabad Municipal Council | 25.00 | Completed in 2013 | |
3 | Supervision of Internal Concrete Roads along with Electrical work along roads in Panvel Municipal Council Area. | Panvel Municipal Council | Panvel Municipal Council | 500.00 | Completed in 2015 | Sh. Sanjay Katekar (City Engg. 9920064301) |
4 | Carrying out Water Audit and Leak detection work in Kamothe Node of CIDCO area | CIDCO | CIDCO | 30.00 | Completed in 2015 | |
5 | Carrying out Water Audit and Leak detection work in Kharghar Node of CIDCO area | CIDCO | CIDCO | 3.50 | Completed in 2015 | |
6 | Aurangabad’s Consumer Survey for Water Supply Scheme. | Aurangabad City Water Utility Company Pvt. Ltd | Aurangabad City Water Utility Company Pvt. Ltd. | 22.5 | Completed in 2013 | Sh Shreerang Deshpande (Project Director) - 09823133986 |
7 | Carrying Out Consumer Survey, Supply and Installation of Flow Meters, Water Audit, Energy Audit, Hydraulic Modeling and GIS Mapping For Panvel Water Supply Scheme | Panvel Municipal Council | Panvel Municipal Council | 148.00 | Completed in 2014 | Sh. Ueikhe, Engg. 09404370467 |
8 | Carrying Out Consumer Survey, Supply and Installation of Flow Meters, water Audit and Energy Audit, Hydraulic Modeling and GIS Mapping For Gangapur Water Supply Scheme | Gangapur Municipal Council | Gangapur Municipal Council | 48.00 | Completed in 2014 | Sh Somnath Jadhav (Chief Officer) - 09158183592 |
9 | Underground Sewerage System in Airoli Sector 6,7,8 | Navi Mumbai Municipal Corporation | Swastik Infralogic (I) Pvt. Ltd. | 383.99 | Completed in 2013 | |
10 | Augmentation of Sewerage System in Artist Village in Belapur Ward for Navi Mumbai Municipal Corporation | Navi Mumbai Municipal Corporation | M.N. Kalbhor | 181.91 | Completed in 2013 | |
11 | Providing and Replacing RCC Sewer line in Diwale Gaon in NMMC Area | Navi Mumbai Municipal Corporation | Swastik Infralogic (I) Pvt. Ltd. | 300.00 | Completed in 2013 | |
12 | Providing and Replacing RCC Sewer line and Construction of SPS in Karave Gaon in NMMC Area | Navi Mumbai Municipal Corporation | Ajay Construction | 250.00 | Completed in 2013 | |
13 | Design and supervision of ETP at Padegaon Slaughter House and STP at near Siddharth Garden Zoo | Aurangabad Municipal Corporation | Aurangabad Municipal Corporation | 600.00 | Completed in 2014 | |
14 | Carrying Out Consumer Survey, Hydraulic Modeling and GIS Mapping For Partur Water Supply Scheme | Partur Municipal Council. | Partur Municipal Council. | 24.31 | Completed in 2014 | |
15 | Preparing detailed design, drawing and estimates for Sewerage Pumping Station at Sec-20 of turbhe ward | Navi Mumbai Municipal Council | Navi Mumbai Municipal Council | 299.00 | Completed in 2016 | |
16 | Preparing detailed design, drawing and estimates for Sewerage Pumping Station at Sec-19D of turbhe ward | Navi Mumbai Municipal Council | Navi Mumbai Municipal Council | 300.00 | Completed in 2016 | |
17 | Preparing detailed design, drawing and estimates for Sewerage Pumping Station at Sec-13 of Belapur ward | Navi Mumbai Municipal Council | Navi Mumbai Municipal Council | 300.00 | Completed in 2016 | |
18 | Preparation of DPR of Lake Conservation for Ambad Municipal Council. | Ambad Municipal Council. | Ambad Municipal Council. | 987.00 | Completed in 2016 | |
19 | Preparation of DPR of Jalna Water Supply Scheme and Hydraulic Modeling of Distribution System for Jalna Municipal Council. | Jalna Municipal Council | Jalna Municipal Council | 1357.00 | Completed in 2016 | |
20 | Preparation of DPR for Underground Sewerage System for Khuldabad Municipal Council. | Khuldabad Municipal Council | Khuldabad Municipal Council | NA | Completed in 2014 | |
21 | Providing Consultancy for "Third Party Quality Audit" for the works of Cleaning and Sweeping Services for Vashi, Sanpada, Juinagar, Nerul & Belapur railway stations including forecourt areas | CIDCO | CIDCO | NA | Completed in 2017 | Sh. Barapatre, EE. (9869145325) |
Sr.No | Name of Work | Name of client | Name of Agency | Project Value (Rs lacs) |
Remarks | Reference (contact name & number) |
---|---|---|---|---|---|---|
1 | City Development Plan (CDP) for Junnar Municipal Council. | Junnar Municipal Council | Junnar Municipal Council. | 1745.00 | Ongoing | Sh Zinzad (Chief Officer) - 09028852185 |
2 | Providing Consultancy Services for Development of various works identified by Gadchiroli Municipal Council | Gadchiroli Municipal Council | Gadchiroli Municipal Council | 8900.00 | Ongoing | Sh. R. Dhake, CO. (9623619442) |
3 | "Designing and Establishing the necessary infrastructure including pumping arrangement and laying pipeline network for distribution of treated sewarge water (Grey Water), Preparing details project report along with BOQ, bid documents, Design specification, contact conditions, financial analysis & viability report, for phasewise implementation of scheme for reuse of treated sewage water in Panvel (E& W), Kamothe, Kalamboli & Khaghar Nodes of CIDCO Navi Mumbai | CIDCO | CIDCO | 19100.00 | Ongoing | Mr. Kale (Executive Engineer) 9987567207 |
4 | Preparation of DPR for Underground Sewerage System for Vaijapur Municipal Council. | Vaijapur Municipal Council | Vaijapur Municipal Council | 8400.00 | DPR Submitted for Admin. Approval | |
5 | Preparation, bid evaluation, project management / supervision for sewerage network, sewage pumping station and sewage treatment plant based on sequential batch reactor/cyclic activated sludge process. | Cantonment Board, Deolali Dist. Nashik, Maharashtra | Cantonment Board, Deolali Dist. Nashik, Maharashtra | 5900.00 | Ongoing | Mr. V. R. Patil (City Engineer) 09403697456 |
6 | Preparation Detailed Project Report, bid evaluation, project management / supervision for sewerage network, sewage pumping station and sewage treatment plant based on sequential batch reactor/cyclic activated sludge process. | Cantonment Board, Nasirabad Dist. Ajmer, Rajasthan | Cantonment Board, Nasirabad Dist. Ajmer, Rajasthan | 6000.00 | Ongoing | Mr. Ashok Kumar (CEO) 07073183799 |
7 | Providing Consultancy Services For Development of various works identified by Malshiras Nagar Panchayat | Malshiras Nagar Panchayat, Malshiras, Dist. Solapur | Malshiras Nagar Panchayat, Malshiras, Dist. Solapur | 5000.00 | Ongoing | Sh. Jadhav (Municipal Engg) - 07774070124 |
8 | Preliminary Survey, Design, Preparation Of Dpr, Tender Document And Project Management / Supervision For Sewerage Network, Sewage Pumping Station And Sewage Treatment Plant Based On Sequential Batch Reactor/Cyclic Activated Sludge Process At Kanpur Cantonment of Kanpur Cantonment Board | Kanpur Cantonment Board | Kanpur Cantonment Board | 4000.00 | Ongoing | - |
9 | Providing consultancy services for "Designing and establishing the necessary infrastructure including pumping arrangement and laying pipeline network (Rising main) from MBR Sector – 12 to existing distribution network for distribution of water, Landscaping, waterproofing and structural repairs to existing structures, preparing detailed project report along BOQ, bid document, design specifications in Dronagiri Node, Navi Mumbai". | CIDCO | CIDCO | 2500.00 | Ongoing | |
10 | Augmentation to Existing Water Supply Scheme at Uran Municipal Council | Uran Municipal Council | Uran Municipal Council | 3000.00 | Ongoing |
Sr.No | Name of Work | Name of client | Name of Agency | Project Value (Rs lacs) |
Remarks | Reference (contact name & number) |
---|---|---|---|---|---|---|
1 | Project Management Consultant for Underground Sewerage System for Aurangabad Municipal Corporation. | Aurangabad Municipal Corporation | Fortress Infrastructure Advisory Services | 35500.00 | Ongoing | Sh Kumar (Director Fortress) – 09820292754 Mr. Afsar Siddiqui – (DE AMC) - 09764999584 |
2 | Project Management Consultant for Augmentation Water Supply Scheme Distribution System) for Gangapur Municipal Council under UIDSSMT. | Gangapur Municipal Council | Gangapur Municipal Council | 1844.00 | Ongoing | |
3 | Proof Checking of 2 MLD capacity high tech Sewage Treatment Plant in Kalundre Node of CIDCO area | CIDCO | CIDCO | 5.61 | Ongoing | |
4 | Project Management Consultant for integrated Development of Singada Bodi of Tiroda Municipal Council | Tiroda Municipal Council | Tiroda Municipal Council | 800.00 | Ongoing | |
5 | Supervision of work of transmission line from Gothivali ESR to MIDC tapping Including railway crossing at Rabada | NMMC | NMMC | 255.00 | Ongoing | |
6 | Supervision of work on designing and estimation of distribution network in Sec- 22 and 23 GES in Ghansoli Node of NMMC | NMMC | NMMC | 302.00 | Ongoing | |
7 | Supervision of work of RCC ESR (0.5 Ml) & GSR (1 Ml) Capacity for Mahape area of Koparkhairne Ward | NMMC | NMMC | 242.00 | Ongoing | |
8 | Supervision of Internal Concrete Roads in Panvel Municipal Council Area. | Panvel Municipal Council | Panvel Municipal Council | 2600.00 | Ongoing | |
9 | Carrying Out Consumer Survey, Water Audit, Energy Audit, Supply and Installation of Flow Meters, Hydraulic Modeling and GIS Mapping For Shrigonda Water Supply Scheme | Shrigonda Municipal Council | Tandon Urban Solutions Pvt. Ltd. | 89.00 | Ongoing |